26/01/11

Installation:

The keypad and PME unit should be inspected for physical damage before installation.  Any cracked, broken or bent items on either unit should be reported to your shipping firm or to DNA for proper disposition.

Ensure all power is off by disconnecting the marine battery(s) from the boat system or de-energizing the battery switch.

Prepare the unit for installation by removing all packaging materials.  Keypads must be mounted to a flat surface using a properly positioned cut out for the 
keypad connector pigtail.  The keypad-mounting studs should be secured through the panel using 10-32 UNF nut and lock-washer.  Tighten the nuts to snug only.  Do not exceed torque ratings as this will crack or deform the keypad, which will cause intermittent operation.

Connect the keypad pigtail Deutsch connector to the wire harness.  Wire harnesses are not provided by DSS.  They must be designed, manufactured and installed to meet the DSS Pi series requirements as well as the specific design requirements of the application, for length, termination, wire size, etc.  It is Cruisers Yachts’ responsibility to ensure this was done to meet or exceed design specifications.

To mount the PME, the unit must be installed in a non-submerged, ventilated space as to meet the operational specifications listed in the product documentation.  Units that are not “IP” protected must not be mounted in an engine compartment.  The ambient temperature must not exceed 70 Degrees C.




Secure the PME with four, ¼ - 20 bolts, nuts and washers or equivalent wood screws (not provided).  Tighten to snug only.

Secure the negative power side terminal to the negative power lug and secure with the nut and washer provided.  Secure the positive power side terminal to the positive power lug and secure with the nut and washer provided.  Take care to never reverse the terminal connections or reverse the order of connection. Tighten power lugs to snug only.  Over-tightening will cause the lug to crack or fail.

Never connect the Deutsch 40 pin connector to the PME without connecting the power terminals first.

Important: to un-install the PME from the system, the steps to be taken should be the reverse of the installation sequence.  Never disconnect the power terminals while the Deutsch connector block is still attached.  Failure to disconnect the Deutsch connector block first may cause the PME to receive reverse current causing failure of the unit and voiding any warranties.

The system is now ready for power and operation.  Re-connect the main marine battery(s) to the circuit and follow the operational instructions below.

1 commento:

  1. Do you need custom wire harnesses? I can help...
    Cable Manufacturing Technologies
    280 Buchanan Field Road, Suite #1
    Concord, CA 94520
    www.cmtcables.com
    www.cmtpcb.com



    Cable Manufacturing Technologies (CMT) is a high volume manufacturer/distributor of quality custom & standard (off the shelf) cables. We have over 20,000+ aggressively priced products available. Over 50 years combined experience in the cable industry. Open since 1999. Our knowledgeable sales & support staff is waiting to assist your needs. Ordering is easy: Email your request/cable drawing, quantity and lead-time and I will get you pricing right away.

    At CMT we offer the following:
    • Competitive prices – Give us your target price and will match or beat your current pricing.
    • Timely response – Sales Representatives are available via phone, e-mail, and instant messenger too!
    • A Great Experience – Friendly knowledgeable staff is available to service and assist you.
    • Quality Service – Makes your experience with CMT the best way to do business.
    • Fast Turn Around – Same Day Shipping on standard items (order must be received by 2pm pacific standard time)

    We specialize in Custom Cabling.
    OEM Cable Production Capabilities
    • Partner / ISO Certified Offshore Facility
    • Custom Cable & Wire Harness
    • High Volume Production
    • Million + Volume Capacity
    • Complete Engineering Support

    CMTpcb.com provides PCB assembly solutions including:
    • State-of-the-art printed circuit board assembly, quick turn PCB assembly, and prototype assembly.
    • We are able to provide both conventional through-hole and state-of-the-art surface mount technologies and
    can assemble and test a wide range of high complexity boards.
    • This includes double-sided reflow, fine pitch and BGA technologies.

    Main Products Offering: SMT Assembly : Bonding Assembly : PCB Design and Assembly : 100,000ppm Clean Room

    For more information or for immediate assistance with a cable or PCB quote, please contact:

    Andy Enriquez
    aenriquez@cmtcables.com
    Office: 925 246 5680
    Mobile: 925-381-0576

    RispondiElimina